What affects website cost
A starting website price is a range, not an invoice. Here is what moves the number: pages, features, design and whether the text and photos are ready.
This article is currently available in its original language.

The same “company website” almost never costs the same for two clients. On the Sirenko studio pages you see a starting range. The invoice appears once the pages, languages and the visitor’s next step are clear.
What a “from” price means
On WordPress the guides are €250 for a landing page, €600 for a company site and €900 for a shop. High traffic, a configurator or several countries with complex logic point to Next.js, from €700, €1,500 and €2,500. The same figures sit in the calculator and on the service pages. They are the floor, not a promise of a finished site for that sum.
Domain and hosting sit outside the build
The address and the server are paid every year, apart from the build. They are not a one-off line in the development quote. How to choose a host is covered in the hosting article.
Scope, features and who prepares the materials
A landing page is one page for one offer. A company site usually needs services, about, contacts and legal pages. A shop adds a catalogue, product pages, a cart and payment. Ready text and photos shorten the fill-in. If the studio writes them, that time is separate.
A request form, a messenger, extra languages, online payment, catalogue filters — each item adds work. We do not install everything at once. Extra pieces slow the site and blur the action the page exists for.
How the sum is fixed before we start
First a short description of the job, then a structure mock-up, and only then a quote with stages. There are no hidden extras mid-project: a new page or integration is a separate agreement. Write via contacts or assemble the inputs in the calculator, and we will say what sits in the base scope.

